- Building cost – based on drawing.
- Other infrastructure requirements with cost.
- Section wise machinery list as per required production capacity with cost.
- Utility requirements with cost.
- Quality control section requirements with cost.
- All other requirements related plant with cost.
- Section wise production capacity.
- Energy Consumption.
- Costing per product.